stayed structure meaning in Chinese
拉索结构
Examples
- The stonecutters bridge , planned as a cable - stayed structure , will have a span of about
昂船洲大桥属斜拉桥式设计,跨距约为 - 4 . the side girders , the deck and the lateral beams of the cable - stayed structure are cast - in - place at one time
4 、金马大桥在施工过程中采用边主梁、横隔梁和桥面板三部分分阶段一次现浇。 - - ii - 5 . with the consideration that the cross section of the cable - stayed structure and the rigid frame structure ' s are not uniform , a new joint solution was presented for these different sections
5 、针对金马大桥斜拉桥侧主梁截面与t构侧主梁截面形式不统一的问题,提出了一种不同结构断面的新型连接方法。 - 2 . a new design and construction method different from the traditional way was used in jinma bridge . when cantilever the main girder of the cable - stayed structure , the longitudinal pre - stressed reinforcements are not tensioned at once
2 、金马大桥在斜拉桥设计和施工中采用一种与传统斜拉桥设计和施工不同的新方法,即悬臂浇筑斜拉桥主梁时采用无纵向预应力筋的做法。 - A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented . many aspects of jinma bridge are researched and analyzed , such as the design method , configuration of the superstructure , section choice of the tower , design and construction methods of the deep - water bases , the stiffness of the cooperated rigid frames , strengthening way in the tower . it is concluded that this new structure is the economical , aesthetic and suitable project for the large - span situation
主要内容和结论如下: 1 、提出了独塔斜拉桥与两侧刚构相连接的新型协作体系斜拉桥结构形式,并对该桥的方案比选、设计思路、桥面系结构形式、塔柱截面设计、深水基础的设计及施工方法、协作刚构的刚度选取、塔柱的直束加固等方面作了详细地计算分析和比较。